TowerSAFE International

"For Safe & Legal Erections"

HOME

What is TowerSAFE?

What We Do!

TowerSAFE Objective

Obstructions Defined

Airspace Protected by FAR

FAR Pt. 77.9

FAR Pt. 77.17

FAR Pt 77.19

FAR Pt. 77.21

FAR Pt. 77.23

VFR Traffic Airspace

VFR Defined

Terminal Procedures-TERPS

Air Navigation Facilities

Obstructions

Antenna Side Mount

Antenna Top Mount

Billboards

Bridges

Buildings, Low/High Rise

Towers, Cell/Radio

Water Tanks

Wind Turbines

Cell on Wheels (COWs)

Chimneys

Stacks

Signs

Cranes

Drilling Rigs, Oil/Gas

Workover Rigs, Oil/Gas

Landfills

High Mast Illumination

Power Transmission Lines

Light Poles

Waste Management Facility

Near Airport Obstruction

Other w/ Antenna

Other w/o Antenna

Marking & Lighting

News & Information

Contact Us

WHAT WE DO!
TowerSAFE International performs airspace analysis reports for developers, planners, and construction contractors.

With our airspace feasibility study results, developers and planners can learn where the flow of air traffic is relative to planned developments, altitudes of these flights and the type of aircraft that will be expected to use these routes. 

For planners and construction contractors, our site specific aeronautical analysis will determine what height above ground level you can plan and develop any obstruction--from trees to high-rise condos or landfills to cell towers or water tanks.  Yes, even the cranes used to construct any obstruction will require FAA approval before erection.
 

                    Top                   Back                              Next               Contact

 

TowerSAFE International
"For Safe & Legal Erections"

Web Hosting powered by Network Solutions®